第 8 部分:配网工程 中国南方电网有限责任公司电网建设施工作业指导书 部分:配网工程8 第 配网变压器监测计量终端安装
作 业指 导书
编码:PWZDH-01
408
1
配网架空线路开关配电自动化终端安装作业指导书 PWZDH-03
次 目
······················································································································································ 2适用范围1
22 编写依据······················································································································································
2 ·················································································································································· 作业流程图 3
3 4 安全风险辨析与预控··································································································································
4 作业准备5 ························································································································································
··························································································································································5 6 作业方法6质量控制措施及检验标准 7 ······························································································································
1
8 部分:配网工程第 中国南方电网有限责任公司电网建设施工作业指导书
适用范围1
电压等级1.1
及以下配网工程。35kV
1.2 电气类别 。配网变压器监测计量终端安装
编写依据2
依 据 表 2 编 写
引用资料名称序号 1《电气装置安装工程盘、柜及二次回路结线施工及验收规范》1992—GB 50171 部分:通则》《电气装置安装工程质量检验及评定规程2002 第 1 DL/T 5161.1— 2 5161.8DL/T —2002《电气装置安装工程质量检验及评定规程 第8 部分:盘、柜及二次回路结线施工质量检 验》 3部分:变电电气安装工程》Q/CSG 2 500kV 110kV—2007《~送变电工程质量检验及评定标准第10017.2 4《南方电网工程施工工艺控制规范》—Q/CSG 111052008 》HS《中国南方电网有限责任公司基建工程质量控制作业标准(W)5
3 作业流程图
图3 作业流程图
2
配网架空线路开关配电自动化终端安装作业指导书 PWZDH-03
安全风险辨析与预控4
配网变压器监测计量终端安装 4.1 前,施工项目部根据该项目作业任务、施工条件,参照《电网建 形成该任务的风险分析表。设施工安全基准风险指南》(下简称《指南》)开展针对性安全风险评估工作,配网变压器监测计量终端安装 4.2 按《指南》中与相关联的《电网建设安全施工作业票》(编码: PWZDH-01-01/01),结合现场实际情况进行差异化分析,确定风险等级,现场技术员填写安全施工作业票, 安全员审核,施工负责人签发。
接受交底的作业施工负责人核对风险控制措施,4.3 并在日站班会上对全体作业人员进行安全交底, 人员负责将安全措施落实到各作业任务和步骤中。
超过10 天须工作内容、地点不变时可连续使用 10 天,安全施工作业票由施工负责人现场持有,4.4
重新办理作业票,在工作完成后上交项目部保存备查。
指南险安 务 全 基准风 表 4.1作 业任
序号风险种类危 害 名 称
1全措施
邻近带电设备施工无安 触电
2人安全防护用具
触电冲击钻作业没有使用个 刺伤 在湿度较大的环境下不
按安全电压等级使用照明3灯具
触电
4
设备破损接地线不良或没接地
5施工用电不规范触电 6触电电流互感器二次侧开路 7角位置、地面过度摩擦 8不足 9 控脱手
敷设过程中,电缆与转设备破损 施 线缆出入口封堵措设备停运 搬动电缆盖板过程中失 夹伤 碰撞 搬动电缆盖板过程中盖
10设备破损 板跌落电缆沟、坑内 内坑缆行电 闭封在 运 灼(烫)伤 11 窒息吸烟
风险控制措风险等严格执行“两票”制度1. 设置安全围栏,挂警示牌2. 中等风禁止擅自扩大工作范围3. 设专人监4.
按操作规范使用冲击钻,合理使用个人安全中等风护用潮湿季度应先测量空气湿度,并按安全电压低风求选用灯检查接地线,截面满足要中等风1.加强使用前及使用过程中的检查保护零与工作零线不得混接,开关箱漏电保护器灵敏靠,漏电保护装置参数应匹配并由专业用电管理和检修维护必须规范2. 中等风工进行,配电箱必须上锁,并采取防雨措施工作间断时切断电源3.
必须使用符合要求的线缆,并做好防破4. 措严格按照设计图纸接线及调试,做好回路检中等风工电缆敷设时,从盘上端引出,避免在支架或低风面上发生摩擦,转弯位设专人排放,做到弯曲然,不得小于最小弯曲半线缆敷设进入电房、设备后及时对线缆进出中等风进行封堵,并检查其可靠1. 多人搬动电缆盖板时,应协调一致、平放置中等风单人搬动电缆盖板时,应量力而行,抓2. 走多人搬动电缆盖板时,应协调一致、平1. 放置中等风单人搬动电缆盖板时,应量力而行,抓2. 走严禁在电缆坑内吸烟或向电缆坑内扔烟头、中等风柴等火种 3
第 8 部分:配网工程 中国南方电网有限责任公司电网建设施工作业指导书
序号
称 名 危 害
风险种类
风险等级
风险控制措施
12
剥切电缆外皮时损伤电
设备破损
低风险
对工作人员进行工艺培训,提高施工工艺,选 择专用工具
13 14
缆线芯 剥切控制电缆外护套时 失手割伤手脚 未按要求逐项核对数据
割伤 企业声誉形象 受损
低风险 可接受的风险
剥切外护套时需集中精神,正确操作防止1. 割伤; 使用专用工具2. 严格按照要求逐项核对数据
作业准备5
作业前施工条件 1 5.
条件 施工 表 5.1 作业 前
序号
项目
容内
1
根据本单位实际设置内容(包含本项工作)任务单
2 3预算材料表
设备变更单、设计图纸图纸 含主、辅材
4
施工措施、安全技术交底(项目部级)施工方案
5
根据需要办理涉及进入工作场所的手续、证件相关证照 壁挂式终端安装:墙体必须牢靠、无腐蚀、渗漏等情
确认现场施 6
况。
工条件户外式终端安装:足够的安全距离,并且不影响低压刀闸开关的操作
终端安装位置与高压设备、
线路保持
说执行经审本工序施工负责本工序施工负责经审本工序施工负责经审经审本工序施工负责本工序施工负责有合本工序施工负责
人员、主要工器具及仪器仪表配置2 . 5
表 5.2 人员、主要工器具及仪器仪表配置
序号
项目 施工阶段
内 建议工作
容 现场施工
现场施工
人数负责人质安员
2 技术工终端安装 电流互感器12 人员配置技术工 安装 11 电缆敷设2技术工 及接线 2 技术工终端调试 施工内容相 对应的设备2计量终端、电流互感器、控制电缆、安装辅材等 材料
技术岗位必须持有与作业工相应、有效的上岗证,辅助工得从事电气设备安装等专业工)核对配变计量终端及附件材料的到位及数量;核对电流感器等技术参数,各项参数符设计要求。
4
配网架空线路开关配电自动化终端安装作业指导书 PWZDH-03
)检查确认配网变压器计量(2 终端、电流互感器外观完好、接 线端子等无脱落。
施工内容相 对应的器
工器具:冲击钻、手锤、扳手、螺丝刀、梯子、笔记本电 脑、试验仪、绝缘手套、绝缘鞋、高低压临时接地线、高低
)收集配网变压器计量终端、(3 电流互感器出厂证件、技术资料 (1)根据现场情况使用的工器
具、机械符合相关要求。
3 压验电笔等。
具、机械及 )使用仪表有计量单位检验2( 工器具仪表 机械:车辆等合格证并在合格期间内 施工准备完成可报开工,当施 工作负责人向项目负责人报开工,并由项目负责人完成向 完成开工 工准备不足时,上报该项目负责4 监理单位开工报审手续程序人协调解决
作业方法6
作业方法表 6
明项目容内序号 说 (1)现场施工负责人向进入本施工范围的所有工作人员明 作业内容、作业范围、确交待本次施工设备状态、进度要求、 特殊项目施工要求、作业标准、安全注意事项、危险点及控 制措施、危害环境的相应预防控制措施、人员分工,并签署的安全统一 佩戴 按 安规规定 (班组级)安全技术交底表。帽,统一佩戴有个人照片的作业 1作业前工作 开工前做好(2)工作负责人负责办理相关的工作许可手续,证(或胸卡证),穿着统一的工作 服 现场施工防护围蔽警示措施,夜间施工的,须有足够的照明。
)现场施工负责人组织检查确认进入本施工范围的所有(3 工作人员正确使用劳保用品和着装,并带领施工作业人员进 入作业现场
开始主要2现场施工负责人发出许可开工命令 作业
(1)壁挂式终端安装:箱体安装垂直、牢固,安装高度按 设计要求。
(2)户外式终端安装:垂直安装在台架上,安装牢固,安 装高度按设计要求。
现场施工负责人正确、安全地
计量终端 3)严格按照设计要求安装电器元件。3( 安装)金属箱体接地采用黄绿双色铜芯多股软线,其截面(4
组织作业,现场施工质安员负责现场作业全过程的安全、质量监 控
2 。4mm积≥ (5)安装完成后,终端应便于维护、拆装。终端与带电设
备确保足够的安全距离)检查电流互感器外观无损伤,二次接线螺钉及绕组完1(
好。)电流互感器安装在变压器低压侧,安装应牢固可靠。2(
现场施工负责人正确、安全地
4
电流互感器 安装
)根据终端二次回路按设计图严格对应接线。二次侧的(3极性一致,电流互感器二次侧应一点可极性应接线正确,TA
组织作业,现场施工质安员负责 现场作业全过程的安全规范和质 量跟踪
2mm;电流互感器安装用支架接地时,. 靠接地,其截面积为25支架应有两点与接地网可靠连接。电流互感器二次侧严禁开
路199250171 (1)控制电缆敷设及接线总体原则参照GB —
5
控制电缆敷 设及接线 计量终端
《电气装置安装工程盘、柜及二次回路结线施工及验收规范》JDBH-02 二次电缆敷设及结线作业指导及本系列作业指导书 书。(2)严格按照设计图对电流回路、电压回路进行接线并做 好标识,标识清晰完整、不易脱落电压回路无短路,检查电流回路无开路,1()且相序正确。
现场施工负责人正确、安全地 组织作业,现场施工质安员负责 现场作业全过程的安全规范和质 量跟踪 现场施工负责人正确、安全地
6
5
第 8 部分:配网工程 中国南方电网有限责任公司电网建设施工作业指导书
调试
)与主站进行联调,检查现场数据与远程监测结果的一2( 致性。
组织作业,现场施工质安员负责 现场作业全过程的安全、质量监
)用钳形电流表等仪表实际测量电流、电压等实际运行(3 值,与主站核对数据是否正确
控
质量控制措施及检验标准7
质量控制措施7.1
7.1.1 现场负责人应根据现场情况安排技术人员负责质量监控。
7.1.2 作业人员必须熟悉工程作业流程和质量检验标准;技术岗位人员必须持有与作业相应、有效的上岗
证。
7.1.3 现场负责人在进行安全技术交底时必须详细介绍本作业质量控制要点、常见的质量通病及其防治措
施。7.1.4 作业现场必须有经审核批准的设计图纸和施工方案,作业人员必须按图施工。
7.1.5 施工质量检验一般按以下方式进行。质量检验一般采用三级检验制,施工队(组)对所施工的分项
的质量自检;项目部对所负责施工的分部工程和单位工程组织质量检查,复检比例不宜00% 1工程应进行 。
20%低于 50%;公司对单位工程组织检查,抽检比例不宜低于 小时通知监理现场验收。
24 7.1.6 隐蔽工程施工完成以及全部工序作业完成(转序)时,必须提前 质量控制点7.2
质量控制点表单 表 7.2
配网自动化安装工程
控制点
控制方式 WH ●
S
7.3 检验标准 表 册:配网工程》中的Q/CSG 8 第输变电及配电工程质量验收与评定标准~质量检验按《10kV500kV
要求执行。8-7.18
6
配网架空线路开关配电自动化终端安装作业指导书 PWZDH-03 安全施工作业票 附件 1 ● 编码:PWZDH-01-01/01
工作时间技术员现场负责人工作地点现场安全员
安全风险分析及控制措施 风险控制措施危害名称风险等级序号风险种类
1
邻近带电设备施工无安全措施 冲击钻作业没有
现场作业应严格执行相关安全规程及安全技术措施,并 中等风险 □触电 重点关注但不限于以下措施: 严格执行“两票”制度,设置安全围栏,挂警示牌。□
使用个人安全2中等风险□ 触电、刺伤 禁止擅自扩大工作范围,并设专人监护。□ 防护用具
在湿度较大的环
按操作规范使用冲击钻,□
合理使用个人安全防护用品。
境下不按安全电 3潮湿季度应先测量空气湿度,并按安全电压要求选用触电□□ 低风险 压等级使用照明 灯具。灯具
检查接地线,截面满足要求。□ 接地线不良或 4中等风险□ 设备破损 加强使用前及使用过程中的检查,保护零线与工作零□ 没接地线不得混接,开关箱漏电保护器灵敏可靠,漏电保护 装置参数应匹配。
5中等风险□触电 施工用电不规范 □用电管理和检修维护必须规范,并由专业电工进行, 配电箱必须上锁,并采取防雨措施,工作间断时切断 电流互感器二次 电源。6中等风险 □触电 侧开路
施工电源必须使用符合要求的线缆,并做好防破损措□ 施。
敷设过程中,电缆 地面与转角位置、7低风险□设备破损 严格按照设计图纸接线及调试,做好回路检查工作。□ 过度摩擦 □ 电缆敷设时,从盘上端引出,避免在支架或地面上发 线缆出入口封堵 生摩擦,转弯位设专人排放,做到弯曲自然,不得小 8中等风险□设备停运 措施不足 于最小弯曲半径。
线缆敷设进入电房、设备后及时对线缆进出口进行封□ 搬动电缆盖板过程 9中等风险□夹伤、碰撞 堵,并检查其可靠性。
中失控脱手 多人搬动电缆盖板时,应协调一致、平稳放置。□ 搬动电缆盖板过 程中盖板跌落10 单人搬动电缆盖板时,应量力而行、抓牢走稳。□中等风险□设备破损 电缆沟、坑内
□使用专用工具。
严格按照要求逐项核对数据 □ 企业声誉形未按要求逐项 接 可□ 风的 受 11 核对数据象受损险
7
第 8 部分:配网工程 中国南方电网有限责任公司电网建设施工作业指导书
安全补充事项
平面布置图/
现场接受交底人员签名
备注
(一)本票由现场技术员填写,现场安全员审核,现场负责人签发生效。现场负责人开工前核对风险控制措施说明:并宣读。(二)工作内容、地点、安全措施不变时本票最长可使用十天,否则应重新办票,用后上交备查;当人员发生变
更时,应在备注栏记录变更情况。对新增人员进行交底,并签名确认。(三)应根据现场条件、范围和环境,补充安全事
项或平面布置图。(四)当风险等级与基准风险等级不一致时,项目部应组织相关人员重新进行风险评估并制定措施。(五)
基准风险等级与风险控制措施在开工前现场打“√”。(六)签名不齐全(含代签名的)均作废票处理。